Kontakt

C. HAFNER

Factory planning and project management

Precious metal products for jewellery and technology

From the idea to the rough and factory layout planning, through to comprehensive project management, agiplan accompanied all stages of the realisation of a new factory.

C. HAFNER

agiplan's services

  • Site analysis
  • Plant structure and layout planning
  • Approval procedure coordination
  • Project management of technical trades

C. Hafner has served the precious metal industry for more than 160 years. The fifth-generation medium-sized company stands for innovative recycling, modern machining centres, decorative coatings and profound expertise in precious metal technology.

The products of C. Hafner are used, for example, in medicine and electrical engineering, and for jewellery and watches. In order to meet the steady growth and optimise processes, C. Hafner decided to build a new greenfield facility based on agiplan's site analysis.

From idea to new factory

From the idea up to the rough and factory layout planning, through to the definition of processes and their optimisation, agiplan accompanied all stages of the realisation of the new factory.

As part of the project management of the technical trades, the licensing procedures (BImSchG) and reports were also coordinated. The result is an innovative factory concept, the so-called "Hafner-T", which creates transparency and clarity and, most of all, leaves room for future expansion.

All divisions now benefit from ideal conditions for production and logistics. The "form follows function" principle certainly proved true here.

"agiplan's integrated factory planning is a guarantee for us that our company can secure a future-proof market position even in times of fast-paced competition," says Dr Heinz-Günter Schenzel of the C. Hafner management.

Facts

13
months construction period
50.000
Plot in m²
30 Mio.
Investment in EUR
200
employees
Besides factory planning, agiplan has coordinated the relocation in the new building.
Besides factory planning, agiplan has coordinated the relocation in the new building.
An essential aspect of the new construction is sustainability, which pervades the whole concept.
An essential aspect of the new construction is sustainability, which pervades the whole concept.
C.Hafner invested 36.7 million Euros in their new headquarter.
C.Hafner invested 36.7 million Euros in their new headquarter.
Production, laboratories and administration are arranged in a optimal layout.
Production, laboratories and administration are arranged in a optimal layout.
The layout includes several extension stages in the property which has 5.7 hectares.
The layout includes several extension stages in the property which has 5.7 hectares.
In energy efficiency, waste recycling and occupational safety C. Hafner sets standards.
In energy efficiency, waste recycling and occupational safety C. Hafner sets standards.

Contact

Services

References